Thermal remediation and ERH case studies

Examples of Doxor projects at public properties, active industrial facilities, and deep chlorinated solvent plumes.

Urban school

Thermal remediation at a sensitive school property

680 m² treatment area39 electrodes151 operating days

Benzene targets were reached in less than 110 days, 765 kg of VOCs were removed, and energy use finished 17% below estimate.

Read case study

Active industrial site

ERH with subsidence controls at an industrial facility

900 m² treatment area53 electrodes90–120 day window

After structural investigation, reinforcement, and monitoring, operations restarted and soil and groundwater goals were achieved.

Read case study

Deep CVOC plume

Full-depth ERH heating for chlorinated solvents

149 electrodes6 heating phasesUp to 31 m per electrode

Full-depth heating reached the 100 °C target, with peak readings of 138.9 °C and reductions above 99% in several wells.

Read case study

Start a technical conversation

Bring the conceptual site model. Doxor will bring the right ERH design questions.