Urban school
Thermal remediation at a sensitive school property
680 m² treatment area39 electrodes151 operating days
Benzene targets were reached in less than 110 days, 765 kg of VOCs were removed, and energy use finished 17% below estimate.
Read case study →Active industrial site
ERH with subsidence controls at an industrial facility
900 m² treatment area53 electrodes90–120 day window
After structural investigation, reinforcement, and monitoring, operations restarted and soil and groundwater goals were achieved.
Read case study →Deep CVOC plume
Full-depth ERH heating for chlorinated solvents
149 electrodes6 heating phasesUp to 31 m per electrode
Full-depth heating reached the 100 °C target, with peak readings of 138.9 °C and reductions above 99% in several wells.