Urban school

Thermal remediation at a sensitive school property

ERH for benzene and TPH in a public setting, with monitoring, vapor control, and environmental targets.

680 m² treatment area39 electrodes151 operating days

The challenge

The project required remediation in a public setting with sensitive receptors and clear controls for construction, vapor, and monitoring.

The ERH approach

Doxor operated 39 electrodes across 680 m², supported by vapor extraction, perimeter controls, and continuous performance review.

Documented outcome

The system operated for 151 days. Benzene targets were reached in under 110 days, with approximately 765 kg of VOCs removed.