The challenge
The project required remediation in a public setting with sensitive receptors and clear controls for construction, vapor, and monitoring.
The ERH approach
Doxor operated 39 electrodes across 680 m², supported by vapor extraction, perimeter controls, and continuous performance review.
Documented outcome
The system operated for 151 days. Benzene targets were reached in under 110 days, with approximately 765 kg of VOCs removed.